Areas of application

Taking into consideration: DIN EN 1269

A distinction is drawn between new build and renovation. Every area of application is divided into 3 different floor build-ups.

Version A
Ceilings above heated rooms

Variante_A_rgb.jpg


Version B
Ceilings above unheated or periodically heated rooms or directly on earth

Variante_B_rgb.jpg


Version C
Ceilings over areas with external air temperature

Variante_C_rgb.jpg


Floor build-up New-build

Floor build-up Renovation


Name Size Date
AIRCONOMY® areas of application.pdf3,1 MB06/23/2015