![](/en/references/office-buildings/administration-building-pfaffing-d/BG-Pfaffing-D.jpg?cid=5e.1tu&resize=99f3ab:1024x)
When building the new Administration Building of a trading company in Pfaffing, a cost-saving and energy-efficient heating technology was targetted. A heat pump was installed in conjunction with the AIRCONOMY® system to provide heating, ventilation and cooling. In addition, a comfort controller was installed to ensure the optimal system control. The air flow volumes were designed according the standard DIN 13779.
Project details
Building type: New-build
Area: 393 m²